Quick answer
When New construction fails, troubleshoot in order: file/format, permission/lock, output settings, another tool. New construction can pre-install passive/active systems; cheaper.
Why it matters
Start with the most common and cheapest causes to narrow it down fast.
Pre-install.
Step by step
- Test/retest to confirm radon level/location.
- Choose sub-slab/crawlspace/ventilation by foundation.
- Get 2-3 quotes; confirm fan/piping/warranty.
- Retest after mitigation to confirm results.
Common mistakes
- Installing without testing.
- Price only, not fan/piping/warranty.
- No post-mitigation retest.
- Ignoring crawlspace/new construction.
Checklist
- Test/retest/level/location.
- Foundation/crawlspace/ventilation.
- Fan/piping/sealing/exhaust.
- Warranty/retest/electricity.
- Quotes/permits/insurance.
Key facts
- Pre-install.
- Passive.
- Active.
FAQ
How do I troubleshoot a failed New construction task?
When New construction fails, troubleshoot in order: file/format, permission/lock, output settings, another tool. New construction can pre-install passive/active systems; cheaper.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: EPA