Quick answer
Local Permits processing is generally safe; avoid unknown plugins and untrusted pages for sensitive files. Electrical/exhaust/structure may need permits.
Why it matters
File permission/privacy matters more than extra features.
Electrical.
Step by step
- Test/retest to confirm radon level/location.
- Choose sub-slab/crawlspace/ventilation by foundation.
- Get 2-3 quotes; confirm fan/piping/warranty.
- Retest after mitigation to confirm results.
Common mistakes
- Installing without testing.
- Price only, not fan/piping/warranty.
- No post-mitigation retest.
- Ignoring crawlspace/new construction.
Checklist
- Test/retest/level/location.
- Foundation/crawlspace/ventilation.
- Fan/piping/sealing/exhaust.
- Warranty/retest/electricity.
- Quotes/permits/insurance.
Key facts
- Electrical.
- Exhaust.
- Structure.
FAQ
Is handling Permits safe?
Local Permits processing is generally safe; avoid unknown plugins and untrusted pages for sensitive files. Electrical/exhaust/structure may need permits.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: EPA