Quick answer
After Sub-slab, spot-check the output, then decide whether to delete/archive the original; keep a backup. Sub-slab fits basement/slab; by area/sealing.
Why it matters
A backup lets you roll back if the output is wrong.
Basement.
Step by step
- Test/retest to confirm radon level/location.
- Choose sub-slab/crawlspace/ventilation by foundation.
- Get 2-3 quotes; confirm fan/piping/warranty.
- Retest after mitigation to confirm results.
Common mistakes
- Installing without testing.
- Price only, not fan/piping/warranty.
- No post-mitigation retest.
- Ignoring crawlspace/new construction.
Checklist
- Test/retest/level/location.
- Foundation/crawlspace/ventilation.
- Fan/piping/sealing/exhaust.
- Warranty/retest/electricity.
- Quotes/permits/insurance.
Key facts
- Basement.
- Sealing.
- Area.
FAQ
What should I do after Sub-slab?
After Sub-slab, spot-check the output, then decide whether to delete/archive the original; keep a backup. Sub-slab fits basement/slab; by area/sealing.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: EPA